RLC has developed generator, line, bus, and transformer protective relay settings, supported construction activities and supervised or performed testing and commissioning activities for the following projects.

    • 61850 Standards Review and Update
    • Coordination Studies and Settings Design
      • Area Directional Instantaneous Ground-overcurrent Removal Coordination Study
      • Bristol Substation
      • Canton Mountain Wind Farm
      • Eight Flag CHP Relay Settings (Nationally Recognized Award winning project, Power Engineering 2016 Best Project Award)
      • Ludden Lane Substation
      • Northfield Mountain
      • Passadumkeag Wind
      • Pisgah Wind Farm
      • Saddleback Ridge Wind
      • South China Substation
      • South Sanford Substation
    • NERC Compliance Settings Review
      • Berkshire Power
      • Cabot Station
      • Millstone Power
      • Northfield Mountain
    • Relay Settings Design
      • Bear Swamp Substation
      • Mount Support #16 Substation – Wilder #16 Substation 69kV Lines
      • Multiple Three-terminal 115kV Line Settings Designs
      • Sandy Pond Wachusett Line Settings 345kV Line