ProjectPisgah Wind Farm

ProjectPisgah Wind Farm

Located: Maine

The Pisgah Mountain Wind Project consists of 5 – 1.8 MW Vestas wind turbines located on Pisgah Mountain. This project includes, but is not limited to, the Balance of Plant electrical engineering design work necessary for the 34.5 kV underground system from the turbines to the riser poles; the 34.5 kV overhead line between turbines and to the new substation; the 34.5kV to 115 kV substation; the interconnection to BHE Section 66 and the communication/SCADA system.

 

Scope of Services:

  • Design and specification of 115/34.5 kV line terminal including all equipment, foundations, structures, cabling, control & protection systems, and communication systems
  • Design and specification of 34.5 kV aerial and underground collection system including all necessary equipment, cabling, materials and pole alignments
  • Relay and SCADA device settings
  • Wind Turbine Grounding and Conduit Plans
  • Technical Liaison services with local telecommunication providers, Central Maine Power/IUSA and ISO-NE
  • Technical Analyses and assessments (Turbine ground grid, short circuit analysis, lightning protection)
  • Record drawings and equipment documentation